A Location Method for Reliability-Critical Paths Based on Monte Carlo Search Tree

The development of nanoscale technology for integrated circuit chips highlights the reliability of circuit reliability. The path formed by the basic unit of the circuit has a significant influence on the overall reliability of the circuit. Therefore, it i

  • PDF / 79,948,082 Bytes
  • 569 Pages / 439.37 x 666.142 pts Page_size
  • 102 Downloads / 290 Views

DOWNLOAD

REPORT


Xiaofeng Chen Hongyang Yan Qiben Yan Xiangliang Zhang (Eds.)

Machine Learning for Cyber Security Third International Conference, ML4CS 2020 Guangzhou, China, October 8–10, 2020 Proceedings, Part III

Lecture Notes in Computer Science Founding Editors Gerhard Goos Karlsruhe Institute of Technology, Karlsruhe, Germany Juris Hartmanis Cornell University, Ithaca, NY, USA

Editorial Board Members Elisa Bertino Purdue University, West Lafayette, IN, USA Wen Gao Peking University, Beijing, China Bernhard Steffen TU Dortmund University, Dortmund, Germany Gerhard Woeginger RWTH Aachen, Aachen, Germany Moti Yung Columbia University, New York, NY, USA

12488

More information about this series at http://www.springer.com/series/7410

Xiaofeng Chen Hongyang Yan Qiben Yan Xiangliang Zhang (Eds.) •





Machine Learning for Cyber Security Third International Conference, ML4CS 2020 Guangzhou, China, October 8–10, 2020 Proceedings, Part III

123

Editors Xiaofeng Chen Xidian University Xi’an, China Qiben Yan Michigan State University East Lansing, MI, USA

Hongyang Yan Guangzhou University Guangzhou, China Xiangliang Zhang Division of Computer, Electrical and Mathematical Sciences and Engineering King Abdullah University of Science Thuwal, Saudi Arabia

ISSN 0302-9743 ISSN 1611-3349 (electronic) Lecture Notes in Computer Science ISBN 978-3-030-62462-0 ISBN 978-3-030-62463-7 (eBook) https://doi.org/10.1007/978-3-030-62463-7 LNCS Sublibrary: SL4 – Security and Cryptology © Springer Nature Switzerland AG 2020 This work is subject to copyright. All rights are reserved by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publisher, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication. Neither the publisher nor the authors or the editors give a warranty, expressed or implied, with respect to the material contained herein or for any errors or omissions that may have been made. The publisher remains neutral with regard to jurisdictional claims in published maps and institutional affiliations. This Springer imprint is published by the registered company Springer Nature Switzerland AG The registered company address is: Gewerbestrasse 11, 6330 Cham, Switzerland

Preface

The Third International Conference on Machine Learning for Cyber Security (ML4CS 2020) was held in Guangzhou, China, during October 8–10, 2020.