Correction to: Distributionally robust optimization with multiple time scales: valuation of a thermal power plant
- PDF / 368,393 Bytes
- 1 Pages / 439.37 x 666.142 pts Page_size
- 8 Downloads / 238 Views
		    Correction to: Distributionally robust optimization with multiple time scales: valuation of a thermal power plant Wim van Ackooij1   · Debora Daniela Escobar2 · Martin Glanzer2   · Georg Ch. Pflug2,3  Received: 28 November 2019 / Accepted: 4 December 2019 © The Author(s) 2019
 
 Correction to: Computational Management Science https://doi.org/10.1007/s10287-019-00358-0 The original version of this article unfortunately contained a mistake in Eq. (1). The correct expression is given below: [T−1 ] ∑ max 𝔼 𝛽t ht (zt , ut , 𝜉t ) T−1 {ut }t=0
 
 t=0
 
 s.t. zt+1 = gt (zt , ut , 𝜉t+1 ) ∀t = 0, … , T − 1 ut ∈ Ut (zt ) a.s. ∀t = 0, … , T − 1, ut = ut (zt , 𝜉t ), zt ∈ Zt a.s. ∀t = 0, … , T − 1
 
 (1)
 
 Publisher’s Note  Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
 
 The original article can be found online at https://doi.org/10.1007/s10287-019-00358-0. * Martin Glanzer [email protected] 1
 
 OSIRIS, EDF R&D, 7 Boulevard Gaspard Monge, 91120 Palaiseau, France
 
 2
 
 Department of Statistics and Operations Research, University of Vienna, Oskar‑Morgenstern‑Platz 1, 1090 Wien, Austria
 
 3
 
 International Institute for Applied Systems Analysis (IIASA), Laxenburg, Austria
 
 
 
 13
 
 Vol.:(0123456789)		
Data Loading...
 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	