Correction to: Distributionally robust optimization with multiple time scales: valuation of a thermal power plant

  • PDF / 368,393 Bytes
  • 1 Pages / 439.37 x 666.142 pts Page_size
  • 8 Downloads / 200 Views

DOWNLOAD

REPORT


Correction to: Distributionally robust optimization with multiple time scales: valuation of a thermal power plant Wim van Ackooij1   · Debora Daniela Escobar2 · Martin Glanzer2   · Georg Ch. Pflug2,3  Received: 28 November 2019 / Accepted: 4 December 2019 © The Author(s) 2019

Correction to: Computational Management Science https​://doi.org/10.1007/s1028​7-019-00358​-0 The original version of this article unfortunately contained a mistake in Eq. (1). The correct expression is given below: [T−1 ] ∑ max 𝔼 𝛽t ht (zt , ut , 𝜉t ) T−1 {ut }t=0

t=0

s.t. zt+1 = gt (zt , ut , 𝜉t+1 ) ∀t = 0, … , T − 1 ut ∈ Ut (zt ) a.s. ∀t = 0, … , T − 1, ut = ut (zt , 𝜉t ), zt ∈ Zt a.s. ∀t = 0, … , T − 1

(1)

Publisher’s Note  Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

The original article can be found online at https​://doi.org/10.1007/s1028​7-019-00358​-0. * Martin Glanzer [email protected] 1

OSIRIS, EDF R&D, 7 Boulevard Gaspard Monge, 91120 Palaiseau, France

2

Department of Statistics and Operations Research, University of Vienna, Oskar‑Morgenstern‑Platz 1, 1090 Wien, Austria

3

International Institute for Applied Systems Analysis (IIASA), Laxenburg, Austria



13

Vol.:(0123456789)