Study of an Innovation Indicator Applied to Future Projects Monitoring Using the Earned Value Technique
Evidence shows that companies with a business model based on innovation have a higher growth in terms of sales and operating margins. The objective of this work is to study through a practical case the innovation indicator applied to the tools and techniq
- PDF / 16,905,744 Bytes
- 531 Pages / 453.543 x 683.15 pts Page_size
- 38 Downloads / 306 Views
José Luis Ayuso Muñoz José Luis Yagüe Blanco Salvador F. Capuz-Rizo Editors
Project Management and Engineering Research AEIPRO 2019
Lecture Notes in Management and Industrial Engineering Series Editor Adolfo López-Paredes, INSISOC, University of Valladolid, Valladolid, Spain
This book series provides a means for the dissemination of current theoretical and applied research in the areas of Industrial Engineering and Engineering Management. The latest methodological and computational advances that both researchers and practitioners can widely apply to solve new and classical problems in industries and organizations constitute a growing source of publications written for and by our readership. The aim of this book series is to facilitate the dissemination of current research in the following topics: • • • • • • • • • • • • • •
Strategy and Enterpreneurship Operations Research, Modelling and Simulation Logistics, Production and Information Systems Quality Management Product Management Sustainability and Ecoefficiency Industrial Marketing and Consumer Behavior Knowledge and Project Management Risk Management Service Systems Healthcare Management Human Factors and Ergonomics Emergencies and Disaster Management Education
More information about this series at http://www.springer.com/series/11786
José Luis Ayuso Muñoz José Luis Yagüe Blanco Salvador F. Capuz-Rizo •
Editors
Project Management and Engineering Research AEIPRO 2019
123
•
Editors José Luis Ayuso Muñoz E.T.S. Ingeniería Agronómica y de Montes Universidad de Córdoba Córdoba, Spain
José Luis Yagüe Blanco Departamento de Ingeniería Agroforestal Universidad Politécnica de Madrid Madrid, Spain
Salvador F. Capuz-Rizo Departamento de Proyectos de Ingeniería Universitat Politècnica de València Valencia, Spain
ISSN 2198-0772 ISSN 2198-0780 (electronic) Lecture Notes in Management and Industrial Engineering ISBN 978-3-030-54409-6 ISBN 978-3-030-54410-2 (eBook) https://doi.org/10.1007/978-3-030-54410-2 © Springer Nature Switzerland AG 2021 This work is subject to copyright. All rights are reserved by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publisher, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication. Neither the publisher nor the authors or the editors give a warranty, expressed or implied, with respect to the material
Data Loading...