Investigating Resilience Engineering Through Safe Work Method Statements in Residential Construction
This paper reports on an investigation of resilience engineering as a construction safety strategy through safe work method statements. Safe work method statements are a regulated strategy for controlling health and safety risks in Australia. However, the
- PDF / 40,522,729 Bytes
- 385 Pages / 439.37 x 666.142 pts Page_size
- 28 Downloads / 272 Views
Waldemar Karwowski · Tareq Ahram · Darko Etinger · Nikola Tanković · Redha Taiar Editors
Human Systems Engineering and Design III Proceedings of the 3rd International Conference on Human Systems Engineering and Design (IHSED2020): Future Trends and Applications, September 22–24, 2020, Juraj Dobrila University of Pula, Croatia IHSED International
Human Systems Engineering and Design Conference
www.ihsed.org
Advances in Intelligent Systems and Computing Volume 1269
Series Editor Janusz Kacprzyk, Systems Research Institute, Polish Academy of Sciences, Warsaw, Poland Advisory Editors Nikhil R. Pal, Indian Statistical Institute, Kolkata, India Rafael Bello Perez, Faculty of Mathematics, Physics and Computing, Universidad Central de Las Villas, Santa Clara, Cuba Emilio S. Corchado, University of Salamanca, Salamanca, Spain Hani Hagras, School of Computer Science and Electronic Engineering, University of Essex, Colchester, UK László T. Kóczy, Department of Automation, Széchenyi István University, Gyor, Hungary Vladik Kreinovich, Department of Computer Science, University of Texas at El Paso, El Paso, TX, USA Chin-Teng Lin, Department of Electrical Engineering, National Chiao Tung University, Hsinchu, Taiwan Jie Lu, Faculty of Engineering and Information Technology, University of Technology Sydney, Sydney, NSW, Australia Patricia Melin, Graduate Program of Computer Science, Tijuana Institute of Technology, Tijuana, Mexico Nadia Nedjah, Department of Electronics Engineering, University of Rio de Janeiro, Rio de Janeiro, Brazil Ngoc Thanh Nguyen , Faculty of Computer Science and Management, Wrocław University of Technology, Wrocław, Poland Jun Wang, Department of Mechanical and Automation Engineering, The Chinese University of Hong Kong, Shatin, Hong Kong
The series “Advances in Intelligent Systems and Computing” contains publications on theory, applications, and design methods of Intelligent Systems and Intelligent Computing. Virtually all disciplines such as engineering, natural sciences, computer and information science, ICT, economics, business, e-commerce, environment, healthcare, life science are covered. The list of topics spans all the areas of modern intelligent systems and computing such as: computational intelligence, soft computing including neural networks, fuzzy systems, evolutionary computing and the fusion of these paradigms, social intelligence, ambient intelligence, computational neuroscience, artificial life, virtual worlds and society, cognitive science and systems, Perception and Vision, DNA and immune based systems, self-organizing and adaptive systems, e-Learning and teaching, human-centered and human-centric computing, recommender systems, intelligent control, robotics and mechatronics including human-machine teaming, knowledge-based paradigms, learning paradigms, machine ethics, intelligent data analysis, knowledge management, intelligent agents, intelligent decision making and support, intelligent network security, trust management, interactive entertainment, Web intelligence and multimedia