Study of Electre II Multiple Attribute Decision-Making Method in Construction Project Management Mode Selection
Construction project management mode selection are more complex multi-attribute decision-making problems, it has very high demand to the application of multiple attribute decision-making method. Electre II of multi-attribute decision-making method takes i
- PDF / 253,631 Bytes
- 6 Pages / 439.37 x 666.142 pts Page_size
- 28 Downloads / 174 Views
Study of Electre II Multiple Attribute Decision-Making Method in Construction Project Management Mode Selection Jingzhong Ma and Yuxin Liang Abstract Construction project management mode selection are more complex multi-attribute decision-making problems, it has very high demand to the application of multiple attribute decision-making method. Electre II of multi-attribute decision-making method takes into account the cognitive characteristics of people in decision-making, constructed two preference relations that strong is better than weak, the whole sort of multi-attribute decision-making program, which has great application value. This chapter analyzes the basic problem of the construction project management mode selection, and pointed out that the nature of the problem of multi-attribute decision-making, and give basic steps about the application of Electre II method. Keywords Construction project management mode • Multiple attribute decisionmaking • Electre II • Decision scheme of total ordering
42.1 Introduction In the modern decision activity, multiple attribute decision-making problems is the actual with most of the decision-making problems. Because in decisionmaking, must consider at the same time satisfy the more goals (rule) requirement, and between multiple targets and restrict each other, often contradictory, this makes the multi-objective decision problem become more complicated. The goal of the construction project management is usually composed by the cost quality security and progress, there are complex relationships between each of the target. Therefore, construction project management model decision-making is more J. Ma (*) Tangshan College, Tangshan 063000, Hebei, China e-mail: [email protected] Y. Liang Hebei United University, Tangshan 063000, Hebei, China
W. Du (ed.), Informatics and Management Science I, Lecture Notes in Electrical Engineering 204, DOI: 10.1007/978-1-4471-4802-9_42, © Springer-Verlag London 2013
315
316
J. Ma and Y. Liang
complex multi-attribute decision-making problems, it has very high demands to the application of the multi-attribute decision-making. The traditional multiple attribute decision-making method has simple weighting method, multiple attribute value function method and close to ideal point, the Analytic Hierarchy Process (AHP) and Electre decision-making methods developed since the 1970s. AHP method is particularly suited to the hierarchical structure of decision-making problems, mature and widely applied in practice, Professor Salty taking into account the relationship between the layers goal to develop into the ANP network analysis. Compared with other decision method, Electre method is able to fit selection, order and group and so on the different decision the goal request, consider people decision-making cognitive characteristics, suitable for true attribute and pseudo attributes, etc. Various kinds of decisionmaking preferences relationship, not necessarily rely on determining weight, for sensitivity analysis etc., and has great applicat