Team Organization and Personnel

The personnel and organization of environment management are decided by the project management model of the mega construction project. Project management is categorized by the nature of different works and organizational characteristics, listed as below:1

  • PDF / 10,027,852 Bytes
  • 329 Pages / 453.543 x 680.315 pts Page_size
  • 29 Downloads / 176 Views

DOWNLOAD

REPORT


Environmental Management in Mega Construction Projects

Environmental Management in Mega Construction Projects

Jianming Yang

Environmental Management in Mega Construction Projects

123

Jianming Yang UL Standard and Technical Services Co. Ltd. Shanghai China

Translated by Agnes Zhang, Shanghai International Theme Park Company Ltd, Shanghai, China

ISBN 978-981-10-3604-0 DOI 10.1007/978-981-10-3605-7

ISBN 978-981-10-3605-7

(eBook)

Jointly published with East China University of Science and Technology Press, Shanghai Library of Congress Control Number: 2016963294 © East China University of Science and Technology Press and Springer Nature Singapore Pte Ltd. 2017 This work is subject to copyright. All rights are reserved by the Publishers, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publishers, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication. Neither the publishers nor the authors or the editors give a warranty, express or implied, with respect to the material contained herein or for any errors or omissions that may have been made. The publishers remains neutral with regard to jurisdictional claims in published maps and institutional affiliations. Printed on acid-free paper This Springer imprint is published by Springer Nature The registered company is Springer Nature Singapore Pte Ltd. The registered company address is: 152 Beach Road, #22-06/08 Gateway East, Singapore 189721, Singapore

Für Meine Familie

Foreword

Quand le Dr. YANG m’a demandé de préfacer son livre « Environmental Management in Mega Construction Projects », j’en fus d’abord flatté puis quelque peu inquiet. Flatté parce qu’il pensait à moi pour cette noble tâche et inquiet parce que le sujet abordé est d’une telle ampleur que je doutais un instant de mes compétences à comprendre. J’ai pris du temps ... l’auteur me le pardonnera ! Je devais avant tout m’imprégner du chemin parcouru au cours des dix dernières années par Jianming YANG qui fut, au début des années 2001, le meilleur étudiant chinois à l’ENSCMu (Ecole Nationale Supérieure de Chimie de Mulhouse, France), une école d’ingénieurs chimistes parmi les plus réputées de France que j’ai eu l’honneur de diriger pendant le séjour de l’auteur parmi nous. Pour ce faire, je me suis tout d’abord remémoré l’étudiant Jianming. Un être d’exception comme on n’en rencontre que trè