Devising a Novel Means of Introducing Collaborative Decision-Making to an Automated Water Bottling Plant to Study the Im
Cycle time refers to the amount of time allotted to accomplish a certain process in an assembly process. The deviation from the optimal cycle time is technically referred to as drift. Drift can be negative or positive. Positive drift represents the time s
- PDF / 30,502,903 Bytes
- 816 Pages / 453.543 x 683.15 pts Page_size
- 11 Downloads / 137 Views