Large deflection glass facade in typhoon area: Taikoo Place 2 podium wall

  • PDF / 8,152,751 Bytes
  • 22 Pages / 547.087 x 737.008 pts Page_size
  • 83 Downloads / 161 Views

DOWNLOAD

REPORT


PROJECTS & CASE STUDIES PAPER

Large deflection glass facade in typhoon area: Taikoo Place 2 podium wall Giovanni De Mari

Received: 3 February 2020 / Accepted: 27 August 2020 © Springer Nature Switzerland AG 2020

Abstract The case study presented is a 195 meters tall office tower with a raised podium made of full height glass panels, up to 15 meters high. The panels are only restrained by prestressed high-strength stainlesssteel rods, lying entirely in the glass panel build-up, composed by four 12 mm thick plies, laminated with 1.52 mm thick sheets of ionoplast interlayer, with an overall thickness of approx. 52 mm. Due to the facade geometry and the high wind expected, movement joints between rods are introduced, allowing for differential movements to avoid peak stresses in the glass panels. Also, smooth transition between rod rectangular section at the interface with the glass panels to circular section at anchor points need to be ensured by CNC machining to avoid failure of the rod anchors due to fatigue. Sophisticated non-linear 3D FEM models had to be analyzed to predict glass stresses, differential movements to be accommodated by the joints and geometrical transition between rod sections. The main innovation of this facade was the use of prestressed rods in conjunction with jumbo size glass panels. As tension structures experience large movements, it was crucial to understand the effect of these deformations imposed by the rods onto the full height glass panels, analyzing steel and glass members together as a single facade entity. Furthermore, in contrast to typical cable wall facade where the prestressed elements (cables) are offset from the glass line, here the rods are located in G. De Mari (B) Eckersley O’Callaghan, London, UK e-mail: [email protected]

the plane of the glass panels and completely flush with them, ensuring the thinnest possible build-up in relation to the large facade span. A rocking portal frame, moving together with the rods to avoid excessive warping in the glass panels, has been used as a solution to deal with the required opening in the facade. An additional complication was given by the high wind load (typhoon) applied on the facade which required rods’ prestress in the order of 1000 Kilonewton to limit glass stresses and deflections. Keywords Glass · Structural glass · Glass engineering · Case study · Finite element analysis · Pre-Tensioned structure

1 Introduction Architects’ desire for taller and more transparent facades has pushed the Structural Engineers into a more structural use of glass and research of alternative structural systems. The three main current systems when dealing with tall glass facades include: glass fins, fullheight glass panel (simply spanning from top to bottom) and cable walls. These systems have different pros and cons, which may or may not suit the architectural aspirations and the structural constraints. A “hybrid” system is herein presented as a case study, a system composed of full height glass panels and prestressed rods. This system combi