Correction to: Optimal release time determination via fuzzy goal programming approach for SDE-based software reliability

  • PDF / 177,044 Bytes
  • 1 Pages / 595.276 x 790.866 pts Page_size
  • 30 Downloads / 182 Views

DOWNLOAD

REPORT


(0123456789().,-volV)(0123456789().,-volV)

CORRECTION

Correction to: Optimal release time determination via fuzzy goal programming approach for SDE-based software reliability growth model S. Chatterjee1 • Bhagyashree Chaudhuri1



Chandan Bhar2

Ó Springer-Verlag GmbH Germany, part of Springer Nature 2020

Correction to: Soft Computing https://doi.org/10.1007/s00500-020-05385-7

While typesetting the article, the affiliation for the corresponding author Bhagyashree Chaudhuri has been affiliation twice. The correct affiliation has been copied below. Department of Mathematics and Computing, Indian Institute of Technology (ISM), Dhanbad, India. The original article has been corrected. Publisher’s Note Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

The original article can be found online at https:// doi.org/10.1007/s00500-020-05385-7. & Bhagyashree Chaudhuri [email protected] 1

Department of Mathematics and Computing, Indian Institute of Technology (ISM), Dhanbad, Jharkhand, India

2

Department of Management Studies, Indian Institute of Technology (ISM), Dhanbad, Jharkhand, India

123